Skip to content
Breaking News

Breaking News

  • Home
  • World
  • Business
  • Health
  • Entertainment
  • Life Style
  • Sports
  • Toggle search form

Railway Minister Vaishnaw And Japans Minister Nakano Inspect Bullet Train Stretch In Surat

Posted on October 3, 2025 By Admin No Comments on Railway Minister Vaishnaw And Japans Minister Nakano Inspect Bullet Train Stretch In Surat


Surat (Gujarat): Minister of Railways Ashwini Vaishnaw, along with Japan’s Minister of Land, Infrastructure, Transport and Tourism Hiromasa Nakano, on Friday inspected the construction of the Surat stretch of the Mumbai-Ahmedabad High-Speed Rail (MAHSR) bullet train project. The Japanese Minister was accorded a traditional Garba welcome at the Surat airport.

The two Ministers reviewed significant aspects of the project during their visit, including the advanced track slab laying car and the track slab adjustment facility, both key components. They expressed satisfaction with the quality standards being followed and commended the rapid pace of construction.

The visit reflects strong collaboration between India and Japan in implementing India’s first High-Speed Rail corridor.

Add Zee News as a Preferred Source


Surat is set to witness a major boost in growth and connectivity with the upcoming Bullet Train station. The station has been thoughtfully designed with a strong focus on passenger comfort and convenience. Soothing interiors, natural lighting through skylights, and well-ventilated platforms will ensure a calm and pleasant travel experience.

A Multi-Modal Integration plan has been prepared in collaboration with Surat Municipal Corporation (SMC) and Surat Urban Development Authority (SUDA) under the project for Station Area Development along the Mumbai-Ahmedabad High Speed Rail project (SMART). This will allow passengers to easily switch between metro trains, buses, taxis, autos, and other local transport, ensuring smooth traffic flow around the station. Such connectivity will significantly reduce transition time, making travel faster, safer, and more convenient for everyone.

India’s first 508 km long Bullet Train corridor is being constructed between Mumbai and Ahmedabad. Out of 508 km, 323 km of viaduct and 399 km of pier work have been completed, including 17 River bridges, five PSC (pre-stressed concrete) and nine Steel bridges.



Source link

Business Tags:Ashwini Vaishnaw, Bullet Train, Bullet Train In Gujarat, Bullet Train News, India Bullet Train, Mumbai-Ahmedabad Bullet Train, Railways Minister

Post navigation

Previous Post: Green leader Zack Polanski backs legalisation of all drugs
Next Post: Arizona girl’s death ruled homicide after being kept in cage at grandmother’s home: report

More Related Articles

Germany provides €45m for projects in Pakistan – SUCH TV Business
Husband In Debt? This 1874 Law Still Secures A Woman’s Money In India Business
SBP injects Rs12.38 trillion | The Express Tribune Business
Unions plan 1-day strike against Samsung – The Times of India Business
Ron DeSantis and Fox News, Old Friends, Hit Turbulence Business
Petroleum products prices expected to witness a major reduction on December 16 – SUCH TV Business

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • ICC urged to end ‘pre-arranged’ India-Pakistan clashes
  • Hundreds of trekkers escape from blizzard-struck Everest in Tibet
  • Bitcoin Breaks All-Time High Records, Trading Near $125,000; Why Is Cryptocurrency Rising?
  • Breaking The Myth: Why Homegrown Doesn’t Mean Compromise On Quality Or Style
  • Angry Outbursts Or Silent Struggles? The Hidden Pain In A Child’s Rage

Categories

  • Business
  • Entertainment
  • Health
  • Life Style
  • Sports
  • World

Copyright © 2025 Breaking News.

Powered by PressBook Blog WordPress theme