Skip to content
Breaking News

Breaking News

  • Home
  • World
  • Business
  • Health
  • Entertainment
  • Life Style
  • Sports
  • Toggle search form

Railway Minister Vaishnaw And Japans Minister Nakano Inspect Bullet Train Stretch In Surat

Posted on October 3, 2025 By Admin No Comments on Railway Minister Vaishnaw And Japans Minister Nakano Inspect Bullet Train Stretch In Surat


Surat (Gujarat): Minister of Railways Ashwini Vaishnaw, along with Japan’s Minister of Land, Infrastructure, Transport and Tourism Hiromasa Nakano, on Friday inspected the construction of the Surat stretch of the Mumbai-Ahmedabad High-Speed Rail (MAHSR) bullet train project. The Japanese Minister was accorded a traditional Garba welcome at the Surat airport.

The two Ministers reviewed significant aspects of the project during their visit, including the advanced track slab laying car and the track slab adjustment facility, both key components. They expressed satisfaction with the quality standards being followed and commended the rapid pace of construction.

The visit reflects strong collaboration between India and Japan in implementing India’s first High-Speed Rail corridor.

Add Zee News as a Preferred Source


Surat is set to witness a major boost in growth and connectivity with the upcoming Bullet Train station. The station has been thoughtfully designed with a strong focus on passenger comfort and convenience. Soothing interiors, natural lighting through skylights, and well-ventilated platforms will ensure a calm and pleasant travel experience.

A Multi-Modal Integration plan has been prepared in collaboration with Surat Municipal Corporation (SMC) and Surat Urban Development Authority (SUDA) under the project for Station Area Development along the Mumbai-Ahmedabad High Speed Rail project (SMART). This will allow passengers to easily switch between metro trains, buses, taxis, autos, and other local transport, ensuring smooth traffic flow around the station. Such connectivity will significantly reduce transition time, making travel faster, safer, and more convenient for everyone.

India’s first 508 km long Bullet Train corridor is being constructed between Mumbai and Ahmedabad. Out of 508 km, 323 km of viaduct and 399 km of pier work have been completed, including 17 River bridges, five PSC (pre-stressed concrete) and nine Steel bridges.



Source link

Business Tags:Ashwini Vaishnaw, Bullet Train, Bullet Train In Gujarat, Bullet Train News, India Bullet Train, Mumbai-Ahmedabad Bullet Train, Railways Minister

Post navigation

Previous Post: Green leader Zack Polanski backs legalisation of all drugs
Next Post: Arizona girl’s death ruled homicide after being kept in cage at grandmother’s home: report

More Related Articles

Success Story: The Boy Who Quit School At 15 Now Runs A Company Bigger Than Havells Business
UPI fraud clampdown: NPCI to end P2P collect requests from October 1; Banks, apps told to block pull transactions permanently – Times of India Business
Global Biofuels Alliance may be a key G20 takeaway under India’s presidency – Times of India Business
Do You Throw Your Online Delivery Boxes After Opening Parcel? Know How It Can Make Your Bank Account Zero, Tips To Stay Protected Business
SBP commits to enhancing financial inclusion | The Express Tribune Business
Exceptional hygiene, stronger businesses Business

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • North Sea oil and gas firm Petrofac files for administration
  • This man ate 24 eggs everyday for 30 days – his blood reports came as a shock!
  • Babar Azam’s batting position for South Africa T20Is confirmed
  • Sydney Sweeney’s relationship with controversial Scooter Braun raises eyebrows
  • Arrests made as anti-ICE agitators caught on camera clashing with federal officers outside Portland facility

Categories

  • Business
  • Entertainment
  • Health
  • Life Style
  • Sports
  • World

Copyright © 2025 Breaking News.

Powered by PressBook Blog WordPress theme